I just came back from a weekly meeting with the contractors. All is going well and the last purlins are being attached to the roof of Bank B. Purlins tie the trusses together and the roofing is attached to them.

We are in the middle of the South Pacific Games right now. There are athletes from 22 island nations here to participate in many different events. The country is all spruced up and it is quite an exciting time to be here.

With all of the construction going on around Samoa, we expected delays in our efforts on the school but to this point have not experienced any concerns with workers or materials. That should be behind us now and I expect that there may be a a shortage of work now for many people as I am sure that the government will be scaling back on new construction. A lot of money has been spent to complete the venues, roads and to beautify high traffic areas.


Bank A has most of the roofing steel attached.


The masonry subcontractors are busy on all walls. Here they are putting a fine cement topping on the bricks in Bank A in preparation for painting a sealer coat next week.


From the back, a view of the work on Bank B with the excavation for the bathroom block in the foreground. The roof is almost ready for sheeting. They will wait until Monday to begin sheeting and give the workers the day off tomorrow (Saturday) so that they can attend some of the various sporting events around the country.

Wednesday, August 29, 2007

August 29, 2007

The roof has been almost entirely covered with corrugated steel on Bank A. Bank B has all of the trusses up and should be covered with steel by the end of this week except for the last 30 feet or so on each bank.

The foundation for the washroom block across the back is started and we should see block walls going up shortly. They will then tie the three roofs together with new trusses and complete the "U" shape of the building.

Construction is on target for a November completion. Everyone here is getting excited and it will be ready for students and teachers in the new year.

Tomorrow I will try to add a picture with the roofing steel over much of Bank A.


These are very heavy trusses and it took about six very strong construction workers to lift and set them into place.


The man in the middle is Fonoti Felisi Brown. He and his partner Fiti own F&F quality Construction. With him are his construction Forman and the electrical contractor. As you can see the trusses are almost complete in this picture.


They made an interesting jig for constructing the trusses right on sight. One was built and nailed onto the jig/table and then each successive truss was built on top of it so that they were all identical. The gang nails were all hammered in by hand.


These pictures are only of Bank A of the school. Bank B is just about one week behind. The walls went up quickly and the window frames installed.


Monday, August 13, 2007

August 13, 2007

Happy Father's Day

Today is Father's Day holiday in Samoa. It is celebrated on Sunday but Monday is a national holiday. Regardless, the men are at work. In the last few days the foundation has been completed on Block B and the walls are starting to go up. Block A is well under way with window holes and doorways appearing. The trusses are under construction on-site and we are anticipating seeing some being erected on Block A on Friday of this week. All is going well!



Rear view of Block A with the walls getting higher and higher and a view of the window holes.

Wednesday, August 8, 2007

August 8, 2007

Another week or so of construction and the walls are starting to appear. These are all from the A Wing. The B Wing is just a few days behind. The slab on B Wing should be poured today.



First few courses of cement block are being set in place.



Interior walls are coming as well.



I don't remember equipment like this when I was here before.


The floor slab being poured.


The same.



And more.