Work is moving along. By the end of this week the two classroom wings should be ready for the pouring of the slab floors. The hole for the septic system has been excavated and a lot of rock and soil moved around to re-contour the land.
Everything is progressing well and is on schedule.
The following pictures give an idea of how things are doing.
A few courses of concrete block make up the foundation wall.
Footings being poured.
Apia Concrete supplied the concrete.
Everything is progressing well and is on schedule.
The following pictures give an idea of how things are doing.
A few courses of concrete block make up the foundation wall.
Footings being poured.
Apia Concrete supplied the concrete.